Brista Installations Finalized
The installation works at Brista are now finalized. Thanks to our engineering team for delivering our ColdOx™ system for waste reception plant near Stockholm, Sweden. It is important to mention that this project has by far the record airflow being treated by our system 185 000 m3/h. The system treats the air from the reception hall and processing equipment.