Waste reception hall – biogas plant
Centriair received an order for an odour treatment system for a Waste reception hall in Norway. Air volume treated is 51 000 m3/h and the installation will be finalized in August 2016.
Centriair received an order for an odour treatment system for a Waste reception hall in Norway. Air volume treated is 51 000 m3/h and the installation will be finalized in August 2016.